Geometrica Studio: From Concept to Cost

 

What Geometrica Needs for a Reviewed Budget

 
 


Geometrica Studio estimates are designed for early planning.

A reviewed budget requires enough project information for Geometrica to understand whether the concept is serious, feasible, and within Geometrica’s scope.

Not every early idea is ready for review. This guide explains what information to send and how to determine whether your project is ready for a review.

 
 
 

Please Include

To help Geometrica evaluate whether a project is ready for a reviewed budget, please provide as much of the following information as available:

  • Estimate Ref from Geometrica Studio

  • Project location and country

  • Intended use of the building or cover

  • Your role: owner, architect, developer, contractor, consultant, operator, or other

  • Owner or sponsor status: Who is backing the project?

  • Approximate span, footprint, or area

  • Target schedule or desired completion period

  • Budget range or funding expectation

  • Applicable codes or known loads, if available

  • Cladding expectations, such as metal, translucent, insulated, acoustic, corrosion-resistant, or other requirements

  • Available plans, sketches, site plans, drawings, specifications, or program documents

  • Site status: owned, leased, under study, or not yet selected

  • Funding path: funded, under approval, fundraising, grant, financing, or exploratory

Priscilla Garza